Wistow Bridge
Description
Rattee & Kett’s works included surveying the existing soffits and cut waters to produce a works package to restore the masonry at the same time the carriageway was being extended. This included petrographic testing the original material to ensure the correct material was use for all replacement.
The works involved:
- Specification design.
- Correct stone selection.
- Site installation.
- Graffiti removal.
Other work in Public sector
Other Stonemasonry projects
Wistow Bridge - Case Study - Download pdf